Hazer Archives - Australian Manufacturing https://www.australianmanufacturing.com.au/tag/hazer/ Australian Manufacturing News. Events, Resources and Information Thu, 17 Oct 2024 02:59:38 +0000 en-AU hourly 1 https://wordpress.org/?v=6.6.2 https://www.australianmanufacturing.com.au/wp-content/uploads/2017/06/au.png Hazer Archives - Australian Manufacturing https://www.australianmanufacturing.com.au/tag/hazer/ 32 32 Hazer and Mitsui strengthen partnership with graphite market expansion focus https://www.australianmanufacturing.com.au/hazer-and-mitsui-strengthen-partnership-with-graphite-market-expansion-focus/?utm_source=rss&utm_medium=rss&utm_campaign=hazer-and-mitsui-strengthen-partnership-with-graphite-market-expansion-focus Thu, 17 Oct 2024 02:59:38 +0000 https://www.australianmanufacturing.com.au/?p=181154 Hazer Group has extended its non-binding Memorandum of Understanding (MOU) with Japanese trading giant Mitsui & Co, Ltd (Tokyo, Japan), pushing forward joint efforts to explore potential markets for Hazer’s low-emissions graphite. 

The post Hazer and Mitsui strengthen partnership with graphite market expansion focus appeared first on Australian Manufacturing.

]]>

Hazer Group has extended its non-binding Memorandum of Understanding (MOU) with Japanese trading giant Mitsui & Co, Ltd (Tokyo, Japan), pushing forward joint efforts to explore potential markets for Hazer’s low-emissions graphite. 

The agreement, which builds on the original MOU announced on 16 November 2022, will now continue for another year, with automatic renewals unless terminated by either party, as revealed in an ASX announcement. 

The partnership leverages Mitsui’s extensive global network to evaluate the applications of Hazer’s graphite in steel manufacturing, chemicals, and other sectors. 

Hazer has already conducted positive market analysis, identifying promising segments for its graphite, including iron and steel production, thermal energy storage, and water purification.

“We are excited to be extending our strategic partnership with Mitsui,” said Hazer’s CEO and Managing Director, Glenn Corrie. 

“Hazer’s technology is unique in that it produces both low-cost, clean hydrogen as well as a low-emissions graphite product.”

Initial investigations have pointed to a variety of applications for Hazer’s graphite:

  • Steel Manufacturing: Hazer’s graphite demonstrates suitability for both traditional blast furnaces and emerging green-steel processes, owing to its structured composition and iron inclusion.
  • Thermal Energy Storage: Its excellent thermal conductivity and stability make it an efficient medium for heat transfer.
  • Water Purification: Hazer’s graphite has shown potential for enhanced PFAS removal, a growing environmental concern.
  • Construction Materials: The graphite is also being evaluated for asphalt, bitumen, and concrete production.

According to Corrie, the collaboration with Mitsui helps Hazer access challenging markets and critical industries where decarbonisation solutions are in high demand. 

“In light of increased global awareness around the vulnerability of critical mineral supply chains, this is a clear value differentiator for Hazer’s technology in the methane pyrolysis space,” he added.

As part of the extended agreement, the two companies will move forward with further product evaluation and larger sample testing from Hazer’s Commercial Demonstration Plant (CDP). 

Both companies will also engage with potential buyers to establish volumes, pricing frameworks, and potential offtake agreements.

“Through this important partnership with Mitsui, we have jointly identified markets that offer a good fit for our graphite, and discussions are ongoing to establish volume, pricing ranges, and potential offtake opportunities,” Corrie explained.

The post Hazer and Mitsui strengthen partnership with graphite market expansion focus appeared first on Australian Manufacturing.

]]>
Hazer sets stage for commercial expansion with 362 hours of continuous CDP ops https://www.australianmanufacturing.com.au/hazer-sets-stage-for-commercial-expansion-with-362-hours-of-continuous-cdp-ops/?utm_source=rss&utm_medium=rss&utm_campaign=hazer-sets-stage-for-commercial-expansion-with-362-hours-of-continuous-cdp-ops Mon, 30 Sep 2024 02:56:37 +0000 https://www.australianmanufacturing.com.au/?p=180632 Hazer Group has achieved a key milestone at its Commercial Demonstration Plant (CDP), completing over 360 hours of continuous operation and demonstrating improvements in methane conversion.

The post Hazer sets stage for commercial expansion with 362 hours of continuous CDP ops appeared first on Australian Manufacturing.

]]>

Hazer Group has achieved a key milestone at its Commercial Demonstration Plant (CDP), completing over 360 hours of continuous operation and demonstrating improvements in methane conversion.

The CDP performance test program is on track for completion by the end of 2024, the company said in an ASX announcement. 

Following plant optimisations, the company confirmed the achievement of 362 hours of continuous operation with periods of controlled catalyst injection, resulting in key technical advancements. 

The company said its technology has seen substantial progress, with methane-to-hydrogen conversion rates nearing design values.

Hazer CEO Glenn Corrie expressed optimism about the company’s technological strides, saying, “We continue to demonstrate Hazer’s technology is at the forefront of innovation with excellent test program performance which is supporting our commercialization strategy.”

Key highlights from the recent test campaign include stable reactor operations, improved feed gas flow rates, and the avoidance of reactor fouling. 

The technology’s resilience has been further reinforced by the production of Hazer graphite, which is set for advanced customer testing. 

The company said it believes these results will support the commercial scale-up of their methane pyrolysis technology.

“These strong operational milestones are a result of many years of technology development and scale-up success,” Corrie added. 

The use of a fluidised bed reactor (FBR), a proven technology in refining and metallurgical industries, has been pivotal in Hazer’s success.

The company has also underscored the importance of its extensive global patent coverage, with more than 70 patents protecting its methane pyrolysis process.

In the latest campaign, the CDP demonstrated over 97 per cent production uptime.

After over 800 hours of reactor operation, the plant is currently undergoing its statutory inspection, with positive results from material performance under process conditions.

Looking ahead, Hazer said it plans to focus on producing high-purity graphite in the final 2024 CDP campaign, with the aim of completing large-scale application tests. 

Concurrently, work is advancing on the next-generation reactor and heat exchange equipment, which will be key for scaling up hydrogen production to over 20ktpa.

“The CDP test program performance has been the enabler for many commercial discussions,” Corrie explained, highlighting ongoing partnerships with FortisBC, POSCO, ENGIE, and Chubu Electric. 

He emphasised the growing demand for large-scale applications, particularly in hard-to-abate sectors such as steel making and petrochemicals.

The company also reported significant progress with its first large-scale commercial facility in Canada, with partner FortisBC.

The project recently achieved a key milestone with the delivery of 105kg of graphite to FortisBC for use in their small-scale test unit, which will be installed later this year.

FortisBC’s test-rig has completed construction and will be installed on-site in Q4 for testing in early 2025 ahead of FID.

The post Hazer sets stage for commercial expansion with 362 hours of continuous CDP ops appeared first on Australian Manufacturing.

]]>
Hazer Group achieves 240 hours of continuous ops at commercial demonstration plant https://www.australianmanufacturing.com.au/hazer-group-achieves-240-hours-of-continuous-ops-at-commercial-demonstration-plant/?utm_source=rss&utm_medium=rss&utm_campaign=hazer-group-achieves-240-hours-of-continuous-ops-at-commercial-demonstration-plant Mon, 12 Aug 2024 00:14:23 +0000 https://www.australianmanufacturing.com.au/?p=179238 Hazer Group announced a major achievement in the development of its Commercial Demonstration Plant, confirming that it has successfully operated continuously and stably for over 240 hours, marking a crucial milestone in its performance testing.

The post Hazer Group achieves 240 hours of continuous ops at commercial demonstration plant appeared first on Australian Manufacturing.

]]>

Hazer Group announced a major achievement in the development of its Commercial Demonstration Plant, confirming that it has successfully operated continuously and stably for over 240 hours, marking a crucial milestone in its performance testing.

The ongoing “testing – modification – testing” work by our scientists, engineers and technicians has resulted in excellent performance and demonstration of high reliability for our first-of-a-kind technology,” said Hazer CEO Glenn Corrie. 

He added, “We have achieved another major milestone that enables the commercialisation of the Hazer process and supports our growth strategy globally.”

During the 240-hour operation, the CDP demonstrated several key objectives, including continuous production with the injection of catalyst into the reactor bed, stable and reliable solids separation from the product gas stream, and operational reliability with process uptime exceeding targets. 

The plant is now operating in a steady state mode, with continuous production of hydrogen and graphite, the company said in an ASX announcement. 

As the CDP moves forward, the current operations are being optimised to produce commercially representative graphite. 

The graphite produced will undergo quality verification to ensure consistency before distribution to major partners for large-scale testing and analysis.

Moreover, this milestone satisfies a key performance requirement under the ARENA funding agreement, unlocking the next tranche of funding in January 2025. 

This non-dilutive cash flow will support Hazer’s ongoing commercialisation strategy.

In addition to this, the CDP results are being used to advance four existing commercial projects with major partners including POSCO, ENGIE, Chubu Electric/Chiyoda Corporation, and FortisBC.

The data is also aiding the advancement of new customer projects and strategic partnership opportunities.

The next steps for the CDP include planned maintenance and inspections, during which the extensive steady state operation dataset will be analysed. 

This analysis will further inform Hazer’s strategy as they push towards declaring commercial readiness next year.

The post Hazer Group achieves 240 hours of continuous ops at commercial demonstration plant appeared first on Australian Manufacturing.

]]>
Hazer and FortisBC forge ahead with $160M hydrogen facility in Canada https://www.australianmanufacturing.com.au/hazer-and-fortisbc-forge-ahead-with-160m-hydrogen-facility-in-canada/?utm_source=rss&utm_medium=rss&utm_campaign=hazer-and-fortisbc-forge-ahead-with-160m-hydrogen-facility-in-canada Mon, 06 May 2024 05:41:25 +0000 https://www.australianmanufacturing.com.au/?p=176946 Hazer Group Ltd has officially inked a binding Project Development Agreement (PDA) with FortisBC Energy Inc to spearhead the development of a hydrogen production facility in Canada.

The post Hazer and FortisBC forge ahead with $160M hydrogen facility in Canada appeared first on Australian Manufacturing.

]]>

Hazer Group Ltd has officially inked a binding Project Development Agreement (PDA) with FortisBC Energy Inc to spearhead the development of a hydrogen production facility in Canada.

This initiative, set to be established in British Columbia, will leverage Hazer’s technology and boast a production capacity of up to 2,500 tonnes per annum (tpa) of clean hydrogen, accompanied by around 9,500 tpa of Hazer graphite, the company said in a media release.

Upscaling its operations, the firm said this project is 25 times larger than its Commercial Demonstration Plant in Western Australia and represents Hazer’s inaugural commercial-scale initiative to produce low-cost, low-emissions hydrogen and graphite.

FortisBC, a leading Canadian energy utility, will lead the charge in developing the project and supplying the natural gas feedstock, furthering British Columbia’s CleanBC Roadmap to 2030, aimed at reducing emissions in the province.

This agreement builds on Hazer’s recent success with the startup of its Commercial Demonstration Plant in Western Australia earlier this year.

Under the PDA, FortisBC will assume 100 per cent equity ownership and lead the project’s development and operation, while Hazer will serve as the core technology licensor.

This streamlined partnership aligns with Hazer’s ‘capex lite’ business model, mitigating capital expenditure obligations for the company.

Moreover, Hazer will receive license fees determined by a sliding scale model based on facility size, production output, and other pertinent factors.

Notably, Hazer will lead engineering activities related to its core technology components, providing further assurance of project success.

With the completion of the Front-End Engineering and Design (FEED) study, facilitated by Wood Plc, key design elements for the 2,500 tpa plant are in place, paving the way for the project’s advancement into subsequent development phases.

The FEED study, expected to conclude in late 2024, will incorporate feedback from the selection of the project site, with the full integration targeted for completion alongside definitive commercial agreements by early 2025.

Glenn Corrie, CEO and MD of Hazer, expressed his enthusiasm for the collaboration with FortisBC, emphasizing Canada’s strategic significance in deploying Hazer technology.

Corrie remarked, “With the successful start-up and operation of our Commercial Demonstration Plant, this announcement is the next step in Hazer’s commercialisation strategy.”

“FortisBC is the ideal partner to help us on our mission to drive the decarbonisation of hard-to-abate industries utilising our unique climate-technology,” he concluded.

The post Hazer and FortisBC forge ahead with $160M hydrogen facility in Canada appeared first on Australian Manufacturing.

]]>
Hazer Group’s demonstration plant delivers first hydrogen and graphite https://www.australianmanufacturing.com.au/hazer-groups-demonstration-plant-delivers-first-hydrogen-and-graphite/?utm_source=rss&utm_medium=rss&utm_campaign=hazer-groups-demonstration-plant-delivers-first-hydrogen-and-graphite Thu, 01 Feb 2024 01:44:53 +0000 https://www.australianmanufacturing.com.au/?p=174286 Australian technology company Hazer Group announced the initiation of its Commercial Demonstration Plant (CDP) and the groundbreaking achievement of the first production of hydrogen and graphite.

The post Hazer Group’s demonstration plant delivers first hydrogen and graphite appeared first on Australian Manufacturing.

]]>

Australian technology company Hazer Group announced the initiation of its Commercial Demonstration Plant (CDP) and the groundbreaking achievement of the first production of hydrogen and graphite.

The ASX-listed company introduced feed gas to the reactor at Hazer process conditions, resulting in the successful production of hydrogen and Hazer-manufactured graphite at the facility.

Hazer said it aims to ramp up operations throughout the first half of CY2024, executing a performance testing program.

This program is designed to provide comprehensive data demonstrating the plant’s commercial readiness.

The focus of the performance testing program will be on showcasing continuous operation at a commercial scale, setting the stage for integration into Hazer’s global commercial project portfolio.

Hazer’s CEO and MD Glenn Corrie expressed that achieving the successful start-up of the Commercial Demonstration Plant (CDP) and the production of cost-effective, low-emission hydrogen and graphitic carbon through their pioneering pyrolysis technology represents a significant milestone.

“As the team strive towards extended continuous operation of the plant in 2024 we are excited to build on this momentum for the next scale-up of the technology with our global partners in key markets, including North America,
Europe and Asia,” Corrie noted.

The CEO also emphasised that the CDP stands as the culmination of more than a decade of cutting-edge research, development, and engineering innovation.

He commended the Hazer team’s dedication, courage, and resilience in reaching this transformative milestone. Corrie extended appreciation to shareholders, partners, and key stakeholders who supported Hazer’s journey towards becoming a leading commercial clean-technology company.

“Our pipeline of opportunities is growing and with our CDP proving our technology can operate at commercial scale, I’m confident that 2024 will open-up further demand for our disruptive technology that can provide clean hydrogen to accelerate global decarbonisation,” Corrie stated.

The post Hazer Group’s demonstration plant delivers first hydrogen and graphite appeared first on Australian Manufacturing.

]]>
Hazer’s CDP progresses towards start-up with hot reactor finish https://www.australianmanufacturing.com.au/hazers-cdp-progresses-towards-start-up-with-hot-reactor-finish/?utm_source=rss&utm_medium=rss&utm_campaign=hazers-cdp-progresses-towards-start-up-with-hot-reactor-finish Mon, 06 Nov 2023 03:38:12 +0000 https://www.australianmanufacturing.com.au/?p=171650 Australian chemicals commercial company Hazer Group Hazer Group is on track to begin Phase 2 of its Commercial Demonstration Plant (CDP) in 2023, marking a crucial milestone on the path to commercial hydrogen and graphitic carbon production.

The post Hazer’s CDP progresses towards start-up with hot reactor finish appeared first on Australian Manufacturing.

]]>

Australian chemicals commercial company Hazer Group is on track to begin Phase 2 of its Commercial Demonstration Plant (CDP) in 2023, marking a crucial milestone on the path to commercial hydrogen and graphitic carbon production.

In an ASX announcement, the company said the completion of the hot reactor follows machining and heat-treatment processes to meet precise specifications.

After passing all final quality checks, the reactor is now en route from the Callidus workshop in Perth to the CDP site for installation and hook-up, a process expected to conclude by mid-November.

This accomplishment signifies the conclusion of the CDP’s construction phase and the commencement of the commissioning and start-up period.

Hazer’s CDP, which remains on schedule for full-scale operations in 2023, aims to demonstrate the viability of the company’s innovative technology for commercial deployment.

Hazer’s Managing Director and CEO Glenn Corrie expressed his excitement about the impending commissioning phase.

“While the final stages of fabrication took a couple of weeks longer than we had anticipated, it was important to ensure the machining and heat treatment processes were performed to the highest standards to meet the specification required by the technology,” the Hazer official said.

Corrie further noted that the completion of the reactor marks a long-awaited milestone and expressed gratitude for the collective efforts involved, emphasising their focus on bringing the CDP online as initially planned.

The successful finalisation of the reactor marks a crucial step forward in Hazer’s technological progress and is an integral element of the CDP, intended to showcase the practicality of the company’s technology for commercial use.

The outcomes from the CDP’s performance testing strategy will be utilised to enhance Hazer’s worldwide commercial project portfolio.

The post Hazer’s CDP progresses towards start-up with hot reactor finish appeared first on Australian Manufacturing.

]]>